The airport has a total aircraft fuel storage capacity of 900,000L. Maintenance facilitiesĪVJET, Avitair / Trans-Sol Avtn and Esso / Exxon are the three fixed based operators (FBOs) at the airport. The first runway (06/24) is 2,743m in length and the second runway (12/30) is 1,737m long. The airport has two runways paved with asphalt. "The airport has two runways paved with asphalt that total 4,516m in length." Runways The DCV baggage systems were installed by Verreault. The airport is equipped with Destination Coded Vehicles (DCV) for automatic baggage handling and sorting. The terminal also includes 13 gates, four airbridges and 11 aircraft stands. The second level includes a VIP lounge, restaurants, bars, cafes, newsagent/tobacconist, gift shop, car rental service, free wireless internet service and facilities for disabled people. The first level of the terminal contains an international and domestic flight arrivals area, check-in counters, money exchange and ATMs. The airport has a two-level passenger terminal, which has an annual capacity of 1.4 million people. The expansion increased the passenger handling capacity of the airport to 1.4 million people per year. It included reconfiguring the two levels of the terminal, restructuring the baggage handling and arrivals areas, and reconfiguring and expanding the waiting rooms. The expansion was designed by GPC Architect Consortium. It will include extension and widening of two paved strips, upgrading the underground utilities and construction of new taxiways.Ī $65.8m terminal expansion project was initiated at the airport in 2006. The project will be funded with $21.6m each from the federal government and the airport authority. "A three-year long project for the modernisation of airport infrastructure was proposed in March 2011."Ī three-year long project for the modernisation of airport infrastructure was proposed in March 2011.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |